E60: PAS-Pump + Exhaust Vibration-Damper.

With everything else apparently working, the 530d was still of the road due to the niggling problem of an un-bleedable PAS-system and rattling exhaust.
  • Bleed PAS-system with cap off reservoir and engine off, by turning the wheel lock to lock about 30 times and adding fluid until no more bubbles were coming out.
  • Remove front-bumper and drive back onto ramps.
  • Locate exhaust onto connecting-rods of vibration-damper.
  • Modify connecting-rods to fit new exhaust position.
  • Refit exhaust and reinforcement-plate.
  • Refit engine centre-undertray.
  • Drive off ramps, refit bumper and test drive!
PAS-Pump Bleed:
This is the hardest to bleed PAS-system I have ever come across, though the pipes / pump have been off the car for 3 weeks and could have allowed the system to drain and fill with air more than before. The pump was whining on tickover and making an almighty groan when turned in either direction. The fluid in the reservoir was also frothy white. To fully bleed it required the engine and reservoir cap to be off and the wheel turned full lock left to right about 30 times. To do this I raised the front of the car on axle-stands so the wheels were still touching, but with hardly any weight on them. The first turns lock to lock gulped the remaining fluid right into the system and so much air was coming out I kept re-checking the pipes for a leak. Eventually, the reservoir had swallowed the last of my bottle of fluid and is just about sitting up to the minimum mark, but still bubbles were popping up as the wheel was turned. The lock to lock business continued with me and my dad taking turns for quite some time until there were finally hardly any tiny bubbles rising to the surface. This whole thing was a job in itself, but the pump is very quiet now and the steering assistance is back.

Exhaust Vibration-Damper:
During the first tests there was an almighty rattle from the exhaust from tickover up to about 2k rpm. I assumed this to be because I had left off the exhaust 'vibration-dampers' that brace the bottom of the cat to the gearbox and stop it shaking. I discarded replacing it at first as, if you don't remember exactly the way it all fits together and start bolting your gearbox and exhaust back on willy nilly, then it's impossible to figure out. The long bracket with 3 holes fits around the edge of the gearbox bell-housing, held in by one of the large E14 and two of the smaller E10 Torx-bolts that hold the box to the engine. The connecting-rods then run from the foremost stud on the cat to the N/S stud on the bracket; and from the rearmost stud on the cat to the O/S stud on the bracket, as shown in the picture from TIS. Only trouble was, neither of the rods went anywhere near the brackets. I'm not sure if the entire engine and gearbox is in a slightly different position from before, or it's just the exhaust out of line, or both, but the eyelets on the left-right rod were about 5mm too long for the studs; and the front-rear ones were almost an inch too short. After 2 frustrating hours spent removing mounts and trying to relocate the gearbox / bracket to meet the exhaust I gave up and decided to modify the connecting-rods to fit the new gap lengths. The only remaining way to adjust exhaust position would be to loosen the two nuts holding the cat to the back of the turbo, only to do this requires the rocker-cover / injectors to come back off and I'm not doing that, for now at least.
The modified connecting-rods are below and, due to lack of time, are rather crudely done. I bent the left-right rod down about 3/4" at a steep angle to take 5mm length out of it and help bring it down to the bracket at a flush angle and works rather well. The front-rear was a bit less neatly done and makes use of a piece of 1mm sheet-steel, cut roughly to an inch square and bolted to the rod. It's not the best workaround in the world, but it gets the job done.
After all that, the 'vibration-damper' did not get rid of the rattle! Instead, I traced the annoying noise to the front rubber-mount a bit further down the pipe. The exhaust was banging right into the side of the metal bracket on the gearbox-mount and a bit of fiddling with the adjustable eyelet managed to separate them and killed the rattle dead, so there you go.


Saturday, 11 October 2014

E60: New Engine finally running!

Changed the injector seals last Sunday and gave the ports another good clean. The mist has stopped, but it still did not want to fire. There is fuel to the injectors and the timing is spot on, so this could only mean 2 things - something electronic isn't working properly, or the entire DDE module has fallen out of sync with the engine...

I don't even want to know what the latter option entails, so carried on swapping sensors on the new engine for those that worked on my old one. I found the crank-sensor was completely covered in dirty oil, in fact the whole slot was filled with it. Engine sensors are funny things and I can see how the oil could stop it from seeing the notch on the flywheel, but it doesn't explain why the engine would not turn over well using a can of Easy-Start. Either way, with the crank-sensor from my original lump in place it fired up straight away! Result.

[Video is with EGR-pipe disconnected and no air-filter / muffler fitted.]


  • PAS-pump sounds like it's dying - extreme whine / groan when the wheel is turned - and is now the only thing keeping her off the road. Will try bleeding tomorrow and maybe fresh fluid, but failing that the pump could have packed in or, worse, I've damaged some of the piping / rack while lifting the engine in.
  • Rear rubber exhaust-hanger missing. TIS says to remove the screws holding the hanger-bracket, not remove the rubber. I cut mine off to hastily get the exhaust down and will have to buy and annoyingly fit a new one.
  • Front exhaust vibration-damper simply will not fit. When fitted to the exhaust, the eyelets on the two connecting-rods are way off the studs on the gearbox-bracket. The left-right rod is only about 5mm out, but the front-rear rod is miles off. I will have to remove the rear and centre brackets and try to relocate the exhaust a bit.
Other than that, no iDrive messages, no engine-management light, no 'Increased Emissions', no leaks, no mist and no funny noises. The gearbox and clutch are working fine and the car is desperate to be driven. Curse that power-steering fault!

Wednesday, 8 October 2014

E60: Engine Swap Week - Day 7

  • Remove inlet-manifold, rail, injectors and rocker cover.
  • Improve fit of fuel-rail return pipe.
  • Clean injectors.
  • Clean out injector ports in head.
  • Fit original rocker-cover.
  • Adjust injectors to fit collars tightly.
  • Look for fuel in rail and rail-pressure when cranking.
The only thing I didn't do today was swap my crank-sensor over. I figured the automatic models have a different flywheel so would have a different sensor, but the two transmissions share the same sensor [exact same part no.] so the one that's on should work.

The banjo on the fuel-rail return hose needed refitting, as the jubilee-clip was now fouling the inlet-manifold. It was a bugger to find a way to refit it and give enough gap - the manifold is still fouling slightly.

I fitted my original rocker-cover because the new one has a crack round the MAF-sensor housing, obviously where the donor car had it's bump. The injector collars were fitting a bit loosely in the new rocker-cover too and are a bit tighter now. My original cam-sensor is back on too, which I doubt will make a difference, but can't hurt.
  • Re-attempt start!
NO! The engine is turning ok and there is fuel-pressure. Sadly, there is now a lot of diesel-mist shooting up past the injectors, as in the vid below. Ah well, nothing ever goes smoothly.

Saturday, 27 September 2014

E60: Engine Swap Week - Day 6

  • Replace snapped T-piece on injector leak-off pipes.
  • Torque up crank-pulley and HP-pump.
  • Refit drive-belts.
  • Refit radiators / coolers.
  • Refit headlights and crash bar.
  • Refit slam-panel and grilles / ducts.
  • Plumb cooling, A/C and PAS back in at the front.
  • Loosely refit exhaust and heat-shield.
  • Fill with oil and coolant.
  • Refit ECU and plug loom in.
  • Plug in all wire connectors to engine.
  • Refit fuel-rail and pipes.
  • Refit turbo and exhaust-manifold.
  • Refit rocker-cover and injectors.
  • Refit inlet-manifold.
  • Attempt start!
NOTE: Fasten engine-mount top nuts! Neaten up fuel-rail return pipe!

Well, sadly, it didn't fire right up in the first few tried like last time, but the battery has been sitting for a month and died quickly, so I will charge it overnight and have another crack tomorrow.
  • Check for missing wire-connectors. Crank-sensor?
  • Bleed injectors and check for rail pressure.
  • Flywheel position sensor - is it a different flywheel? Swap to original.
  • Check injector-leads for pulses with multimeter.
  • High-pressure pump - does it need bleeding? Is it working?
  • Is 'Service Due' warning affecting immobiliser?
If all these check out and it still won't go then I will have to get a computer on it and get some fault-codes. I'm back in work next week, without a break, so I should be able to bring the Launch home.

It's been a hella lot of work the last 6 days so it would have been nice to have the engine fire up on the third go like it did when I fitted the new cylinder head, but ah well, I'm full of optimism at the close of today.

Plastic T-piece nozzle snapped off in the injector leak-off hose. Luckily I got fuel pipes with the new engine [even though the pump itself was missing] and didn't have to buy a new one.
From an '03, to an '09 and now back to an '04 - this is the third head in the E60.

Friday, 26 September 2014

E60: Engine Swap Week - Day 5


  • Attempt to lift gearbox underneath car.
  • Lift engine back out.
  • Fit gearbox to engine.
  • Remove bonnet / A/C-duct.
  • Lift engine and gearbox in together [mm to spare!].
  • Fit prop-shaft.
  • Fit gearbox mounts.
  • Fit starter-motor.
  • Fit oil filter/cooler.
  • Fit alternator.
  • Fit PAS-pump.
  • Fit A/C compressor.
  • Fit thermostat.
  • Re-attach lower wiring-connectors.
  • Loosely fit crank-pulley.
  • Loosely attach main electric-cables to alt / starter.
  • Loosely fit anti roll-bar.
NOTE: remember sump wire connector + tighten 10mm screw on gearbox!


Gearbox was getting nowhere from below with so little room under the car, so the engine came back out and we lifted the gearbox on very easily.
By removing the plastic air-con duct at the back and popping the bonnet lifters off so it lifts up vertical, it is possible to just about lift the engine and gearbox in together without lowering the subframe / rack.
Just the rads and injectors now and it's pretty much ready to start.

Thursday, 25 September 2014

E60: Engine Swap Week - Day 4

Had a lost day yesterday when the engine didn't arrive. It only turned up at 1.30pm today, so I will have to concentrate on swapping over the high-pressure pump, flywheel and clutch, as well as removing the loom etc. ready to patch mine in. Lifting the engine in will have to wait until tomorrow.
  • Replace steering-rack / subframe bolts entirely.
  • Remove loom and vacuum-hoses from new engine.
  • Swap over high-pressure fuel-pump.
  • Fit flywheel and clutch.
  • Remove oil filter/cooler and rocker-cover for lifting.
  • Match engines entirely.
  • Lift engine in.
Engine arrived at 1.30pm.


And was finally sat in the bay at 7.30pm.

Tuesday, 23 September 2014

E60: Engine Swap Week - Day 3

  • Drop prop-shaft.
  • Remove slave-cyl. / gearshift linkages.
  • Drop gearbox.
  • Lift engine out.
  • Remove parts for new engine.
Once the prop was down it didn't take long at all to get the engine out. The gearbox is huge, but surprisingly light.




Prep for new engine:
  • Remove clutch.
  • Remove flywheel.
Got the clutch off easy enough, but need a T55 Torx socket to remove the flywheel so that will have to wait until I get it from work tomorrow.



NOTE: Missing bolt from exhaust cross-member.

Monday, 22 September 2014

E60: Engine Swap Week - Day 2

  • Remove headlights and front crash-bar.
  • Remove starter motor.
  • Remove oil filter / cooler.
  • Photograph and disconnect vacuum hoses and wiring-connectors.
  • Attempt remove engine.
  • Remove exhaust-system.
  • Remove heat-shield.
  • Remove gearbox mounts.
  • Remove 2 of 3 prop-shaft bolts [coupling to gearbox].
Sadly, the first attempt did not work. The sump still gets stuck on the sub-frame. TIS says to first remove the prop and gearbox, so it looks like this is the only way.

POA for Day 3:
1. Bolt gearbox mount back up.
2. Loosen remaining prop-shaft bolt.
3. Lift car and put axle-stand under jacking point.
4. Support gearbox and remove mounts.
5. Drop prop-shaft.

NOTE: Cut off rubber exhaust-hanger needs new - Part no. 18207578238

Blue nylon rope not the best for lifting engines, but note a lot of weight is removed from the engine - head, ATF-pump, oil filter-cooler, A/C comp etc.

Sunday, 21 September 2014

E60: Engine Swap Week - Day 1

  • Remove all slam-panel and grilles / trim.
  • Drain and remove radiator.
  • Remove drive-belts.
  • Bleed air-con, remove a/c radiator and compressor.
  • Drain PAS-fluid, remove PAS-pump and cooler.
  • Remove alternator.
  • Remove intercooler.
  • Disconnect and remove injectors / fuel-rail.
  • Disconnect wiring-loom from ECU / relay-box.
NOTE: Broken T-piece on injector leak-off hose needs replacing if doesn't come with engine. [Part no. - 13537789364].



Wednesday, 17 September 2014

E60: 530d Replacement Engine - the time has come!

Im not a fan of engine swaps, they never go perfectly, but with the amount of effort and cost required to fix my original lump, I've decided to bite the bullet and spend the money. After all, I bought the engine-crane... it was as if I knew what was coming.


Here is my new donkey, cheaper than the going rate at £900, but still on the pricey side. Even if I remove my broken engine and put it on a stand to rebuild, the minimum cost will be about £400 for the new piston / timing-case and it will take a lot of evenings work. On top of that, my current engine, the one that was strong as an ox and never had a major problem until that swirl-flap fell in, still has nearly 140k miles under its belt. This new one has just 78k - nothing for one of these, so I guess the extra spend will be worth it and I am absolutely assured that this one has never had swirl-flap damage. It'll arrive on Monday, so it's high-time I booked some holidays from work and fixed the mothership! Oh, and er, continue renovating my new house... Jeez, maybe a month off work would be in order!